Hello Team,
Can I upgrade ACS 5.0.1 to ACS 7.1 directly OR I have to upgrade from ACS 5.0.1 to ACS 5.2 and then ACS 5.2 to ACS 7.1?
I have done the upgradation from ACS 5.2 to ACS 7.1 directly but not sure about ACS 5.0.1 to ACS 7.1.
Do anyone having any idea for upgradation of ACS 5.0.1 to ACS 7.1?
And
Can we upgrade/migrate JBPM workflows(ACS 5.0.1) to Activiti workflows(ACS 7.0) with data?
Any suggetion/help will be thankfull.