Hi there, here's my problem :I am trying to determine if the task controller has any effect ('cause I've been having the feeling it has none for some time now). To do that, I've created a very simple task model and a test workflow.workflow :[size=75](…)
<start-state name="Start">
<task name="ecm:Task1" swimlane="initiator">
<controller>
<variable name="ecm:1" access="read,write,required" mapped-name="ecm:m11"/>
<variable name="ecm:2" access="read" mapped-name="ecm:m12"/>
<variable name="ecm:3" access="write" mapped-name="ecm:m13"/>
</controller>
</task>
<transition name="" to="Node2"></transition>
</start-state>
<task-node name="Node2">
<task name="ecm:Task2" swimlane="initiator">
<controller>
<variable name="ecm:1" access="read,write,required" mapped-name="ecm:m21"/>
<variable name="ecm:2" access="read,write" mapped-name="ecm:m22"/>
<variable name="ecm:3" access="read" mapped-name="ecm:m23"/>
</controller>
</task>
<transition name="" to="end"></transition>
</task-node>
(…)
[/size]task model :[size=75](…)
<type name="ecm:Task1">
<parent>bpm:startTask</parent>
<properties>
<property name="ecm:m11">
<type>d:int</type>
</property>
<property name="ecm:m12">
<type>d:int</type>
</property>
<property name="ecm:m13">
<type>d:int</type>
</property>
</properties>
</type>
<type name="ecm:Task2">
<parent>bpm:workflowTask</parent>
<properties>
<property name="ecm:m21">
<type>d:int</type>
</property>
<property name="ecm:m22">
<type>d:int</type>
</property>
<property name="ecm:m23">
<type>d:int</type>
</property>
</properties>
</type>
(…)
[/size]web-client-config-custom :[size=75](…)
<config evaluator="node-type" condition="ecm:Task2" replace="true">
<property-sheet>
<show-property name="ecm:m11" />
<show-property name="ecm:m12" />
<show-property name="ecm:m13" />
</property-sheet>
</config>
<config evaluator="node-type" condition="ecm:Task2" replace="true">
<property-sheet>
<show-property name="ecm:m21" />
<show-property name="ecm:m22" />
<show-property name="ecm:m23" />
</property-sheet>
</config>
(…)
[/size]When I test this, everything works fine as far as swimlanes and transitions are concerned, but :- the m11 property isn't mandatory (neither in the first task nor in the second)- in the second task, all fields are empty whereas m21 and m22 should have the values entered in the first taskAm I doing something wrong ?Some time ago I avoided these problems by using the <mandatory> option in the task model, and the read-only="true" in the web-client-config. Since properties with identical names in different task types are forbidden, I had defined one "base task type" of which every task in my workflow was a child. This way, property values were passed from a task to the following without using the controller. However, it required that every task be a child from bpm:startTask, and mandatory properties were required in every task, even when the were read-only.I guess this last part must not be very clear, but the important thing is, I know workarounds for this problem. However, using the controller would be much more simple and "clean".Don't hesitate to ask for details, and thanks for any help you choose to offer.Rand